Difference between revisions of "User:LeonoreBanuelos"
From Design Computation
m |
m |
||
| Line 1: | Line 1: | ||
| − | + | Before checking the run relay, turn off the power to the furnace and the condensing unit. The Tech that missed the original appointment provided the service. Capacitors are measured by the Microfarad sometimes shown by the letters uf and Voltage. | |
Revision as of 18:18, 25 December 2018
Before checking the run relay, turn off the power to the furnace and the condensing unit. The Tech that missed the original appointment provided the service. Capacitors are measured by the Microfarad sometimes shown by the letters uf and Voltage.